Find Us

5 Headquarters

4545 Fuller Dr. Suite 412
Irving, TX 75038
Phone: (972) 445-9584
Toll Free: (855) 275-3483
Fax: (855) 329-3493 
email5@energyby5.com

5 - Northeast

865 State Route 33
Ste 3 PMB 1077
Freehold, NJ 07728
Phone: (732) 774-0005
Fax: (855) 329-3483
email5@energyby5.com

5 - Mexico

CP 11000, Miguel Hidalgo
CDMX, Mexico
Phone: +5595287982
mexico@energyby5.com

LEARN

Category: Clients Case Studies Procurement Resiliency

Spotlight – Savings and Flexibility for International Auto Parts Manufacturer

April 21, 2021

Written By: 5

international auto parts manufacturer

5’s client in Mexico provides customers around the world with automatic transmissions, the brain of automobiles. As a manufacturer of Continuously Variable Transmissions (CVT, hybrids) for automobiles, the client offers ecological products that maximize vehicle performance.

When the client attempted to run an RFP for electricity in the qualified supply market, they quickly realized that the complexity of the market warranted the help of a multidisciplinary expert and engaged the team from 5. During the procurement process, the two companies worked together to navigate a few regulatory changes and the client felt supported and relieved to have 5 on their side. Ultimately the client locked in a very competitive fixed-rate contract that provides the necessary flexibility for potential usage variations.

Other Recent Posts

Featured Image
2 min read

Brewing a Smarter Energy Strategy with Eight O'Clock Coffee

By 5
April 27, 2026

Eight O’Clock Coffee is one of America’s original coffee brands, with a long-standing reputation for quality, consistency, and operational excellence. Supporting a national footprint requires dependab... READ MORE >
Featured Image
7 min read

What the Middle East Conflict Means for Energy Markets

By 5
April 27, 2026

“Reports that say that something hasn't happened are always interesting to me, because as we know, there are known knowns; there are things we know we know. We also know there are known unknowns; that... READ MORE >
Featured Image
5 min read

Coincidental Peak Alerts

By 5
April 14, 2026

The official kick-off to summer is almost here. The beginning of summer is also when many regional power grids start to measure a business’ Coincidental Peak demand. The Coincidental Peak (CP) is the ... READ MORE >