Find Us

5 Headquarters

4545 Fuller Dr. Suite 412
Irving, TX 75038
Phone: (972) 445-9584
Toll Free: (855) 275-3483
Fax: (855) 329-3493 
email5@energyby5.com

5 - Northeast

865 State Route 33
Ste 3 PMB 1077
Freehold, NJ 07728
Phone: (732) 774-0005
Fax: (855) 329-3483
email5@energyby5.com

5 - Mexico

CP 11000, Miguel Hidalgo
CDMX, Mexico
Phone: +5595287982
mexico@energyby5.com

LEARN

Category: Clients Procurement Resiliency

Spotlight - Major NYC Hospital Commissions Combined Heat & Power Study

February 14, 2019

Written By: 5

major nyc hospital commisons chp

One of NYC’s largest and most renowned hospital systems was considering a Combined Heat and Power (CHP) plant to increase reliability and safeguard against rising electric costs. 5 was hired to conduct a feasibility study to determine the economic viability of a co-generation system for the hospital’s main facility. Hospitals and healthcare systems are often ideal candidates for CHP systems because of their continued demand for both heat and electricity.

The analysts at 5 first established a baseline of energy usage costs based on existing load characteristics and historical operating profiles. Simulations were developed which modeled future energy costs based on technical and fundamental market analyses. These models also considered extreme market movements, maintenance downtime, output power, parasitic loads, boiler efficiency, and power plant degradation. The resulting life cycle cost analysis determined the Net Present Value and Internal Rate of Return for this CHP project.

The results of this analysis were delivered on time and ahead of schedule. Both facilities and finance executives for this healthcare system were convinced of the efficacy of this CHP project and decided to move forward with its development based on 5’s analysis and recommendations. This new CHP system will not only increase the hospital’s reliability and resiliency, but it will also reduce its electricity costs which can be redirected to improve patient care.

Other Recent Posts

Featured Image
8 min read

5 Things to Know From Our Webinar "How Data Center Growth is Reshaping Power Markets"

By Taylor Duncan, Eric Bratcher, Jon Moore
July 31, 2026

1. Data centers are asking for power at a scale utilities have never planned for. A 20 to 30 MW manufacturing facility used to count as a large customer. Now, some proposed data centers are requesting... READ MORE >
Featured Image
2 min read

Our 8-to-5 Policy

By Cady Thomas
July 24, 2026

How It Worked Everywhere Else Since the onset of deregulation, energy brokers have been accustomed to receiving gifts, expensive meals, and lavish trips from suppliers in the name of relationship buil... READ MORE >
Featured Image
3 min read

Managing Regulatory Risk: How Consumer Power Advocates Helps New York's Largest Nonprofits

By Rakesh Parasuraman, Jon Moore
June 29, 2026

Recognizing that nonprofits in New York City were not adequately represented in energy policy and regulatory matters, Luthin Associates (acquired by 5 in 2019) formed Consumer Power Advocates (CPA) in... READ MORE >