Find Us

5 Headquarters

4545 Fuller Dr. Suite 412
Irving, TX 75038
Phone: (972) 445-9584
Toll Free: (855) 275-3483
Fax: (855) 329-3493 
email5@energyby5.com

5 - Northeast

865 State Route 33
Ste 3 PMB 1077
Freehold, NJ 07728
Phone: (732) 774-0005
Fax: (855) 329-3483
email5@energyby5.com

5 - Mexico

CP 11000, Miguel Hidalgo
CDMX, Mexico
Phone: +5595287982
mexico@energyby5.com

LEARN

Category: Markets PJM

Demand Destruction in PJM

June 24, 2020

Written By: 5

Markets - PJM

PJM released its initial report on electric load reduction as a result of COVID-19. Figure 1 shows the decrease in peak demand (blue bar) and overall electricity usage (green bar) through the middle of May, with weekends shaded in gray. On average, the weekday peak demand (in kW or MW) fell between 6.5% to 15.2%. Overall energy usage (in kWh or MWh) was not as significantly affected and was down by approximately 8% since March 24th. Not surprisingly, the weekends experienced the smallest reduction to demand and consumption.

Estimated Impact of COVID-19 on Daily Peak and Energy

Figure 1: Estimated Impact of COVID-19 on Daily Peak and Energy, by pjm.com

Another part of PJM’s report forecasts when the electricity grid might return to levels before the Coronavirus outbreak. Figure 2 shows PJM’s summer peak demand forecast for the next five years. The original forecast (pre-COVID) predicted that peak summer load in PJM would grow from 148,000 MWs in 2020 to approximately 153,000 MWs in 2025. The green bar indicates the percent decrease in forecasted summer load as a result of the demand destruction caused by COVID-19. PJM is now expecting a decrease of a little less than 1% of its peak summer demand over the next two years. The green line is a reforecast that was done in April to show the revised load growth in PJM. This model shows that PJM predicts that it will take five years for the peak summer electricity load to return to pre-Coronavirus levels.

More details on this analysis from PJM can be found here. 

PJM June 2020 Image 2

Figure 1: RTO Summer Peak Forecast, by pjm.com

Other Recent Posts

Featured Image
2 min read

Why the Name 5

By 5
May 15, 2025

We spend most of our lives in classes, sports and jobs that reinforce the need to look good and to be right, often at the expense of others. Many of our relationships become a zero-sum game; for me to... READ MORE >
Featured Image
7 min read

Actions to Take Today: Navigating Volatility in U.S. Energy Markets

By 5
May 9, 2025

From tariffs and recession risks to renewables and rising demand, this article outlines actionable procurement strategies tailored to today’s evolving energy landscape. READ MORE >
Featured Image
4 min read

What a 5X Increase in PJM Capacity Costs Means For Your Electric Bill

By 5
April 28, 2025

Capacity costs in the PJM Interconnection cleared at unprecedented levels in the latest auction. As shown below in Figure 1, the cost of capacity increased in many parts of PJM by 5x. While this chart... READ MORE >